Working closely with consultants URS at design stage providing 3D Switchboard Drawings for Room Layouts and with BAM Engineering Services this ensured that spacial planning, cable routes and bus bar orientation were all developed and finalised prior to any Switchgear being installed on site.
ICW Powermode were employed to Manufacture, Supply, Install and Commission the complete Low Voltage System for the four office buildings.
This included the following items:
Project
Network Rail Headquarters – Milton Keynes
Client
Network Rail
Main Contractor
BAM
Consultant
URS
Electrical Contractor
BAM Engineering Services
Value
£1.2M
You can find out more about our range of products by contacting one of our experienced team – please don’t hesitate to get in touch!